FCM BB (1928–1932) – The French Mobile Bunker That Never Was
Among the many ambitious French interwar tank projects, the FCM BB is perhaps one of the most unusual. Studied by Forges et Chantiers de la Méditerranée (FCM) between 1928 and 1932, this heavy tank was part of the same generation of projects that gave rise to the Char B1, B2 and B3.
Rather than being designed as a conventional breakthrough tank, the FCM BB was envisioned as a mobile fortress, intended to reinforce the defensive system of the future Maginot Line. Its enormous, box-shaped casemate gave it the appearance of a bunker mounted on tracks.
The proposed armament consisted of two 75 mm guns, housed within its massive fixed casemate. Combined with its exceptionally heavy armour, this would have made it a formidable defensive platform, capable of delivering substantial firepower against enemy forces approaching fortified positions.
Despite its imposing design, the project never reached the full-scale prototype stage. However, it did progress beyond preliminary studies, with development reaching the construction of a 1:59 scale model. Its exact engine configuration remains unknown, while its projected weight is estimated at approximately 50–60 tonnes.
Perhaps its most remarkable feature was its proposed 60 mm of armour all around the vehicle. For the late 1920s and early 1930s, this was an extraordinary level of protection. In some respects, it would have even surpassed the later Char B1 bis, which, roughly a decade after the FCM BB project was initiated, featured 60 mm of frontal armour but only 55 mm on its sides and rear.
Why were these projects abandoned?
The FCM BB, alongside the B2 and B3, ultimately fell victim to a combination of logistical, industrial and political constraints.
One of the major problems was France's existing infrastructure. At the time, the country's railway network, bridges and roads were simply not designed to accommodate such massive vehicles. There were very few exceptions capable of handling tanks weighing over 40-60 tonnes, and suitable railway wagons, bridges and transport routes were scarce. Moving these machines around the country would have been an enormous logistical challenge, even before considering their deployment in combat.
Another important factor was the international political climate. The Geneva Disarmament Conference of 1932 saw several proposals aimed at restricting or abolishing heavy tanks. Among them was the British proposal to abolish tanks weighing more than 20 tonnes. Such proposals created additional uncertainty around the future of heavy tank development, although France itself opposed strict restrictions and argued that very heavy tanks could serve a defensive purpose.
Ultimately, the combination of logistical difficulties, industrial limitations and international disarmament discussions contributed to the abandonment of these increasingly ambitious designs.
The FCM BB remains a fascinating example of the extreme engineering solutions explored during the interwar period. Instead of relying primarily on mobility and offensive manoeuvres, it embodied the idea of bringing the protection and firepower of a fortified position directly onto the battlefield.
Its brick-like silhouette and fixed casemate also make it an interesting early example of the mobile bunker concept, Years before German engineers explored similar ideas with projects such as the Maus and the Tiger-Maus.
About the model
I've recreated the FCM BB as a 3D-printable model, designed primarily for 1:100 scale. It can easily be enlarged for other scales and is suitable for both FDM and SLA printing.
It can be used for collecting, historical dioramas or tabletop gaming.
I'd be interested to hear what you think about this rather unusual piece of French tank engineering!