r/Tile • u/Antique-Film-7616 • 8h ago
Homeowner - Advice about my Contractor Bad Install? - Now What?
Hi all, new here, appreciate any advice.
My wife and I have been using a contractor we really love for a ton of house repairs and renovations. He has done an excellent job on a huge water damage/insurance claim, replaced all the subfloors and flooring throughout the home, built a very nice/sturdy/aesthetic fence, and did various other structural repairs and some nice faux beams, among other things. His work has been great, with a few minor problems here and there, but he always fixed them without issue, and we have been very happy with all of his work up until now.
As part of the insurance claim, he is re-tiling our two bathrooms. We chose a mosaic tile for the guest bathroom, adhesive/mesh backed and already laid out/spaced properly on the mesh.
He finished the guest bathroom today (mortar at least, no grout yet), and we are less than happy with the results. I attached some pictures. There are a ton of spacing irregularities, pieces rotated, significant lippage, lots of problems. The pictures are a small sample, but it is like that throughout the entire area. There are a lot of pieces where there is not even room for grout anymore; they are simply jammed right up against one another.
I talked to him about it, and he said that the pieces of tile were simply falling off the mesh; the adhesive backing was just not holding them on, and he was essentially placing a significant portion of the pieces by hand. He said he had never seen anything like it. I did confirm this as accurate with some leftover tile. The pieces just readily pop right off the backing with minimal pressure, and I am sure it was a nightmare to work with.
He informed us that if we wanted it fixed, we would essentially have to purchase all brand-new tile with proper backing, and they could install it again.
I can understand all the issues with rotation, improper spacing, etc., given that he was basically winging it with pieces falling off left and right. I am sure this was also extremely frustrating, and I feel for him.
My concerns are that he didn't contact me and let me know what was going on, and that I believe he was ready to proceed with grouting if I was okay with the job, so I am questioning his judgment just a bit if he thought this was good enough to move forward with.
Also a bit concerned about the lippage. I'm not sure if it happened because of bad thinset work or because they were adding mortar to individual pieces and trying to essentially glue them back on.
Anyways, total mayhem, I am definitely upset, but more upset that our favorite contractor did this! We really value the relationship.
Would you give him a second chance with a second batch of tile? Insist that someone else do the tile work? We have agreed to a much larger tiling project in the master bathroom at this point, and are now wary of proceeding. I would love some expert opinions. And also any advice on if there are any possible fixes aside from tear-out and redo. I am also totally open to hearing that I am overreacting to the imperfections.
Thanks!