r/TTC • u/SWchartwell86 • 20h ago
Picture New (Prototype) seated barrier spotted on Line 2.
Came across a new added feature on the Bloor-Danforth line. Spoke with a TTC member who noted they are testing it out.
r/TTC • u/SWchartwell86 • 20h ago
Came across a new added feature on the Bloor-Danforth line. Spoke with a TTC member who noted they are testing it out.
r/TTC • u/Fontfreda • 13h ago
Highway 401 is, notoriously known to be, crowded in both way, even till 6pm - which is when I take this photo. And, this doesn't have an alternative - unlike the similarly crowded DVP and Gardiner, where at least a future improved GO train (may be electric, may not - I talked about it in a previous post about the idea around DEMU may also reach similar performance) can be a good alternative to it in a lot of cases.
And we all know, Ford's 401 tunnel approach won't fix it, just going to make it worse.
But the blame is really on the efficiency of the car, not the tunnel. Obviously, we already have a Line 4 here that has done some work. Maybe we should just extend it?
Though there's a problem with it, if we just extend it in the normal way.
In my experience, the 401 can be red on Google Maps and still average around 30 km/h over a rush-hour trip. That’s roughly what the TTC has scheduled on Line 1 during peak periods.
If a subway along the 401 averages the same speed, the car still has a head start because it goes door to door.
So, the train needs to be fast enough to make up for the time you spend getting to the station, waiting, and transferring.
I’d aim for:
- about 2 km between stations on average, with 1.5 km as the usual minimum.
- Exceptions only made for major transfers station.
This is because every additional stop costs riders time for braking, boarding, and accelerating again, so a closely spaced station has to earn its place.
My result is:

The line would be
Then it would run through the five existing Line 4 stations, from Sheppard–Yonge to Don Mills. After it:
Two questions resulted from the design:
Would it beat 401?
My sketch comes to 37.6 km and 20 stations, or 1.98 km per gap. Assuming a 75 km/h top operating speed, I get a rough estimate of 50–53 minutes end to end, averaging 42–45 km/h. That includes about nine minutes for acceleration and braking, nine minutes for station stops, and a few extra minutes for curves and other slow sections.
Vancouver’s Expo Line is a good comparison. Waterfront to King George also has 20 stations, but it covers 28.9 km with 1.52 km between stops on average. TransLink lists 40 minutes end to end, or about 43 km/h. Expo Line has a top speed of 80 km/h, which is faster than TTC. But the target for this version of Line 4 is to use a wider stop spacing to help it get a roughly equivalent speed.
For driving, Renforth - Scarborough Centre is around 35.6 km. Averaging at around 30 km/h, one'd spend about 71 minutes on the road. That gives the subway roughly 18–21 minutes to cover station access, waiting, and transfers before the two trips tie. That’s enough to make it a real alternative for trips with good connections at both ends. It’s also why I’d judge every proposed station by how much time it saves people getting to and from the line versus how much time it adds for everyone riding through.
Would local residents go against it if the line passes through their area without a stop?
This is a really hard question, but I have a very interesting take:
If we could use TBM properly, the area without a station doesn't matter - as there's no development that's really visible around the area. Essentially, there's no need to make a consultation to residence there.
Though I am not sure how Canada/Toronto's property laws are governed with respect to the area underground of one's property.
r/TTC • u/LunaticPostalBoi • 11h ago
More streetcar diversions💀