r/ISRO • • 11h ago

India’s satellite supply chain ‘highly dependent on imports’, says IN-SPACe report

Thumbnail
thehindu.com
59 Upvotes

r/ISRO • • 1h ago

EoI for end-to-end realization of mission ANTARIKSH (Advanced Native Testbed for Analog Research in Indian Kinetography & Station Hardware)

6 Upvotes

Invitation for Expression of Interest (EoI) for End-to End Realization of Mission ANTARIKSH (Advanced Native Testbed for Analog Research in Indian Kinetography & Station Hardware)

[PDF] [Archived]

Scope of Work

The vendor is responsible for the End-to-End Realization of Mission ANTARIKSH, which involves design, development, procurement, fabrication, assembly, integration, testing and commissioning of the analog simulation facility, its modules, associated hardware and software, and support infrastructure. The scope also includes operation and maintenance, technical support for mission campaigns, and preparation of associated documentation and reports.

HSFC is responsible for defining the mission objectives, functional and operational requirements, and providing the agreed reference configurations, interface information and mission procedures.

HSFC will review the designs, monitor progress, review test results and carry out acceptance of the identified deliverables. The suggestive division of scope is given below. Detailed requirements and contractual responsibilities will be specified in the subsequent RFP.

Transfer of Technology

Realization of Mission ANTARIKSH involves development and integration of ground-based simulator modules, mission control systems and associated engineering hardware and software.

HSFC may, where required, extend technical support and make available identified technical know-how, reference configurations, interface information, simulation logic and operational procedures to facilitate realization of the facility by the selected vendor/consortium.

Any Transfer of Technology required for the above activities shall be limited to the systems or processes identified by HSFC and undertaken in accordance with applicable ISRO procedures. The scope of such transfer, including technical documentation and training support, if any, will be specified in the subsequent RFP and the applicable agreements.

Quantum of Work

The vendor shall establish one (01) integrated Mission ANTARIKSH simulation facility and support the conduct of six (06) analog mission campaigns in two (02) operational phases, with three (03) campaigns per phase, preceded by a preparatory dry rehearsal.

The total contract period is three (03) years: one (01) year for facility realization and commissioning, followed by two (02) years for mission operations and inter-mission maintenance. The operational period may be extended by up to three (03) additional years, if required by HSFC. Handover of identified systems forms part of contract completion.

Resources

To execute Mission ANTARIKSH, the vendor shall deploy qualified, experienced and trained engineering, supervisory, technical and operational personnel for the design, development, construction, fabrication, assembly, integration, testing and commissioning of the analog modules, Space Specific Engineering Task (SsET) systems and supporting facilities. The vendor shall also provide personnel for mission control, crew and ground support, mission operations, safety, maintenance and documentation, commensurate with the scope and schedule approved by HSFC.

Appendix

The vendor shall design, develop, construct, procure, install, integrate, test and commission the following terrestrial simulation facilities and systems, and provide the operation, maintenance and technical support required for the specified mission campaigns. Detailed configurations, quantities, performance criteria and acceptance requirements shall be defined by HSFC in the RFP and approved design documents.

Closed Roof Facility (CRF):

A. External Structure

The Closed Roof Facility shall accommodate all analog infrastructure modules, supporting infrastructure and associated engineering systems within a common integrated facility.

(…)

B. Internal Structure - Analog Infrastructure Modules

The Closed room facility shall accommodate the following analog infrastructure modules and associated structural support systems, including the internal scenarios comprising of the hardware elements and internal architecture of Gaganyaan and BAS

IDModuleBasic Requirement
AIM - 01Gaganyaan Crew Module (CM)1:1-scale ground simulation module (3m Ø x 3m height) with compatible crew ingress ladder.
AIM - 02Gaganyaan Service Module (SM)Scaled-down, visually representative mock-up (2.75m Ø x 1.8m height) integrated with the CM simulation setup.
AIM - 03BAS Airlock Module (BAM)1:1-scale terrestrial simulation module (4m x 4m x 4m).
AIM - 04BAS Lab Module (BLM)1:1-scale laboratory module with adapter extension (4m Ø x 8.6m length).
AIM - 05BAS Utility Module (BUM)1:1-scale laboratory module with adapter extension (4m Ø x 8m length).
AIM - 06BAS Crew Support Module (BCM)Cuboidal crew module (12.2m x 2.45m x 2.9m) accommodating four Astronauts.
AIM - 07BAS Node / Connector Module (BNM)A node (2.5m Ø x 3.4m length) connecting BAS Lab Module, BAS Crew Support Module, BAS Utility Module
AIM - 08Neutral Buoyancy Simulator (NBL/NBS)A temporary/semi-permanent aquatic simulator (10m x 10m x 5m - depth) with submerged static BAS module mock-up. A dedicated water supply, filtration, circulation and drainage provisions to be made. (refer the diagram for more details & Infrastructure requirement section)
AIM - 09BAS static module for NBL operations (BNM)3:4 - scale static BAS module limited to only external structure.
AIM - 10Supporting Structural Truss System (SSTS)A MS supporting structural Frame to support the BAS modules.

C. Internal Structure - Supporting Infrastructure

The Closed Roof facility shall provide the following support facilities necessary for crew accommodation, mission operations, medical support and facility maintenance.

IDFacilityAreaRequirement
SI-01Mission Control Centre (MCC)45 m2Mission monitoring, operator stations, communication and telemetry infrastructure (7m × 6.5m).
SI-02Astronaut Isolation / Crew Quarters50 m2Accommodation for 04 crew, (7m × 7.2m) with sleeping pods, toilets, showers, galley, lounge and tabletop trainer.
SI-03Ground Crew Accommodation100 m2Accommodation for 10 personnel (10m × 10m) with sleeping areas, lockers and segregated sanitation facilities.
SI-04Medical Room50 m2Medical assessment, emergency stabilization and treatment facilities (7m × 7.2m).
SI-05Visitor & Media AreaAs requiredControlled visitor reception and observation facilities.
SI-06Mechanical / Machine Room100 m2Generator, mechanical services, maintenance and equipment storage (10m × 10m).
SI-07Pump Room50 m2General water supply, NBL water services and related pumping equipment (5m × 10m).

Space Specific Engineering Tasks (SsET):

Provide the following fifteen (15) principal SsET systems, with the mounting, power, controls, communications, safety provisions and facility/module interfaces required for integrated mission operations.

SsET 01 IVA and EVA Simulation Suits: Provide simulation suits reproducing the selected fit, mobility, ergonomic and operational characteristics of intra-vehicular and extra-vehicular suits, with applicable cooling, communications, monitoring and suspension interfaces.

SsET 02 Upper Torso Compression System: Provide controlled upper-torso compression hardware for representative launch, ascent, abort and re-entry loading cues, integrated with the crew seat and coordinated simulation controls

SsET 03 Vibro-Acoustic Simulation System: Provide crew-seat motion/vibration and acoustic simulation hardware to reproduce controlled cues associated with launch, ascent, abort, re-entry, descent and splashdown, synchronised with the mission sequence.

SsET 04 Docking Simulation Kit: Provide joysticks, crew-console interfaces and computing/control hardware for rendezvous, proximity operations, docking and berthing simulations, with real-time visual feedback and interfaces to the Mechanical Docking Platform

SsET 05 Docking Adaptors and Hatches: Provide representative operable docking adaptors and hatch assemblies for crew transfer, opening/closing, latching/unlatching and simulated capture procedures at the designated module interfaces.

SsET 05.1 Mechanical Docking Platform: Provide the associated controlled-motion platform and payload-module interface for physical approach, alignment, contact, capture and undocking simulation, integrated with SsET 04 and SsET 05.

SsET 06 Internal Gravity Offload System: Provide body-weight offloading and movement-tracking hardware for simulated microgravity translation, equipment handling and hatch operations within the BAS habitation/laboratory module, with suitable harnesses and emergency recovery provisions.

SsET 07 Bharat Arm: Provide manually controlled and automated robotic-arm configurations for payload positioning, alignment and representative berthing operations, with compatible end-effectors, operator controls and protective interlocks.

SsET 08 Non Precision Planar Air Bearing Floor and Miniature Robotic Arm: Provide an air-bearing table and miniature robotic-arm system for low-friction planar movement of spacecraft/module models, supporting proximity, docking and berthing simulation and control-algorithm evaluation.

SsET 09 Space Motion Sickness Induction Chair: Provide a controlled yaw-rotation chair for vestibular adaptation and sensorimotor studies, with occupant restraints, monitoring interfaces, operator supervision and emergency stop provisions.

SsET 10 Extra Vehicular Activity Mobility Simulation Systems: Provide Skylift and suspended EVA configurations for maintenance familiarisation, external task positioning and gravity-offloaded translation, with compatible suit interfaces, restraints and recovery arrangements.

SsET 11 Deployable Solar Array: Provide electromechanical deployment/stowage demonstrators for the Gaganyaan service module and representative static BAS solar-array assemblies for EVA familiarisation, inspection and maintenance rehearsal.

SsET 12 Camera System: Provide fixed and portable camera systems for crew/activity observation, operations monitoring, inspection and mission recording, integrated with the designated module locations and Mission Control Centre.

SsET 13 Orbital Projection Screen: Provide an integrated visual display system presenting synchronised orbital Earth views, space backgrounds and day/night transitions for module viewports and EVA simulation activities.

SsET 14 Health and Fitness System: Provide the agreed exercise, physiological countermeasure and crew-monitoring hardware for analog human-performance studies. The final equipment selection, monitoring scope and operating protocols shall be confirmed by HSFC in the RFP.

SsET 15 Virtual Reality Systems: Provide virtual-reality equipment and associated simulation interfaces for the mission training scenarios specified by HSFC. The final scenarios, hardware configuration and integration scope shall be confirmed by HSFC in the RFP.


r/ISRO • • 1d ago

JAXA press briefing on the Lunar Polar Exploration (LUPEX) mission today.

Thumbnail
youtube.com
16 Upvotes

r/ISRO • • 1d ago

India pitches space co-operation in Canada defence pact talks

Thumbnail
spaceq.ca
23 Upvotes

r/ISRO • • 1d ago

ISRO aims to end the year with first operational launch of SSLV.

Thumbnail
indianexpress.com
38 Upvotes

r/ISRO • • 2d ago

Official webpage for Lunar Polar Exploration (LUPEX) has been updated

249 Upvotes

r/ISRO • • 2d ago

IN-SPACe to make advance payments non-refundable for rocket launches after customers pull out of upcoming SSLV launch which will now carry only two satellites weighing around 60 kg each.

Thumbnail
moneycontrol.com
51 Upvotes

r/ISRO • • 1d ago

People working at isro , how has ai impacted , and which ai models are u using?

4 Upvotes

Title


r/ISRO • • 2d ago

On PSLV-N1 maiden launch delays to early 2027, "The delays are a result of various issues such as coordination with the payload and the available launch window" said A T Ramchandani, Senior Vice-President and Head, L&T Precision Engineering & Systems.

Thumbnail
indianexpress.com
33 Upvotes

r/ISRO • • 2d ago

Lunar Polar Exploration@JAXA(LUPEX on X: "Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions” with researchers and engineers from ISRO, JAXA, ESA, and NASA.

Thumbnail x.com
13 Upvotes

Last week, we held the workshop “Discussion on Characterization of the Lunar Polar Volatiles and Landing Site Candidates for Volatile Exploration Missions.”
Researchers and engineers from ISRO, JAXA, ESA, and NASA gathered to discuss the characterization of lunar polar volatiles and potential landing site candidates for future volatile exploration missions.
The workshop also provided a valuable opportunity for members of the ISRO-JAXA Joint ODCT to meet in person for the first time and exchange perspectives on lunar polar science and exploration.
The group photo includes Joint ODCT members together with students, researchers, and leadership from PRL, reflecting the broad collaboration supporting future lunar exploration activities.
It was a productive and inspiring discussion, highlighting the importance of international cooperation in advancing our understanding of the Moon’s polar regions.


r/ISRO • • 2d ago

OrbitAID plans on-orbit satellite refueling demonstration in December and a commercial mission by end-2027

Thumbnail
business-standard.com
14 Upvotes

r/ISRO • • 4d ago

Official IN-SPACe Announcement of Opportunity for making available Indian Orbital Resources at 93.5°E to the Non-Government Entities

Thumbnail inspace.gov.in
17 Upvotes

r/ISRO • • 4d ago

PhD Positions in Astrophysics (Jan 2027 Intake) at IIST Thiruvananthapuram – Galaxies/CGM, JWST Exoplanets, and GRBs/Radio Transients (Deadline: 1 Dec 2026)

Thumbnail
gallery
12 Upvotes

Applications are open for January 2027 PhD positions in Astrophysics at the Department of Earth and Space Sciences, IIST Thiruvananthapuram:

  • Position 1 (Code PES01 – Prof. Anand Narayanan): Connecting Galaxies to Their Gaseous Environments (CGM/IGM) OR Studying Exoplanet Atmospheres with JWST (Requires valid CSIR/UGC-NET, NBHM, JEST, or GATE score)
  • Position 2 (Code EES02 – Prof. Resmi Lekshmi): Catching Cosmic Explosions — GRBs, gravitational-wave counterparts, TDEs, and radio transients (Open to CSIR/UGC JRF holders)
  • Fellowship: ₹37,000/month (JRF) | ₹42,000/month (SRF after review)
  • Last Date to Apply: 1 December 2026 (23:59 hrs)
  • Apply Online:https://admission.iist.ac.in

r/ISRO • • 5d ago

Got selected as a Scientist SC in civil.

22 Upvotes

I wanted to know about the joining as i didn't get any mail till now, what are job locations for civil, career prospects and work culture. If anyone working there as civil engg please feel free to connect.


r/ISRO • • 6d ago

Gaganyaan G1 delayed again: First uncrewed launch unlikely before February 2027

Thumbnail
indiatoday.in
85 Upvotes

r/ISRO • • 7d ago

Chandrayaan-3 finds 3 distinct layers in Moon's soil

Thumbnail
timesofindia.indiatimes.com
53 Upvotes

r/ISRO • • 7d ago

Gaganyaan is set to be launched in late December or early January 2027

43 Upvotes

Preparations for the first unmanned flight (G-1) of India's first human space mission 'Gaganyaan' are in the final stages. Union Minister Dr. Jitendra Singh told Bhaskar on Wednesday that Gaganyaan is set to be launched in late December or early January 2027.

Source!


r/ISRO • • 8d ago

New (free) book launch: Crafty Moon-craft, showcasing unique slices of creativity in lunar exploration by India’s Chandrayaan missions 🌙

Post image
29 Upvotes

Crafty Moon-craft is available worldwide, and the Ebook version is free for everyone. Details & download at https://jatan.space/crafty-moon-craft-book/


r/ISRO • • 7d ago

Confused about the Eligibility criteria for scientist at isro.

4 Upvotes

I am a dual degree student at iit kgp. My branch is manufacturing science and engineering ( its a sub branch of mechanical engineering) with integrated mtech in industrial engineering. Can i give gate and later icrb to join isro?


r/ISRO • • 8d ago

Masters After Joining

10 Upvotes

Can a BTech graduate who joined as Scientist C opt for higher studies after 3 years of service ?

Like paid leaves or similar options ?

What’s the criteria and chances of leave being approved in centres like VSSC.


r/ISRO • • 10d ago

Jio begins talks with ISRO, Skyroot Aerospace and other homegrown companies amid satellite launch prep

Thumbnail hindustantimes.com
85 Upvotes

r/ISRO • • 10d ago

Has ISRO Started recruiting civilian astronauts through internal channels ?

7 Upvotes

I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.


r/ISRO • • 11d ago

Original Content Witnessed the launch of NVS-03

505 Upvotes

A childhood dream fulfilled.

Witness #ISRO rocket launch ✅

Liftoff Narmal !

Perfarmance Narmal !

🚀🚀🚀🚀🚀🚀

#GSLVF18 #navic #NVS03


r/ISRO • • 11d ago

Deep-ocean submersible Matsya-6000’s 500-m trial dive in early 2027. It would be a significant step towards India’s push to send a crewed vehicle to a depth of 6,000 metres under Samudrayaan Project

Thumbnail
thehindu.com
59 Upvotes

r/ISRO • • 11d ago

How is the ISRO costs so little money compared to other space programs >

10 Upvotes

I am just wondering how can India send all their rockets and probes while barely speeding any money unlike NASA and the ESA.