My wife and I are under contract on our first home: $895K (listed at $915K), built 1988, ~5,200 sq ft in Colorado Springs. Closing is set for Dec 30. Our inspection objection deadline is Dec 3, and our $9,000 earnest money is fully refundable if we terminate by then — walking costs us almost nothing financially.
What the inspection found:
- **Foundation:** cracks and floor heaving/settling in the basement, consistent with soil movement. Inspector recommended a structural engineer. The sellers hired their own engineer, who inspected and (per the agents) says repairs are needed — but the written report and price still haven't been delivered, six days before our objection deadline. The sellers have offered, through the agents, to pay for the work at closing out of their proceeds, or give us a credit instead. The work can't be finished before closing (permits alone can take months here).
- **Plumbing:** the entire house is polybutylene. Sellers won't repipe — a credit toward it is the only offer. A whole-house PEX repipe quotes around $15–20K all-in. Insurance has been a problem: one carrier already declined to write the house citing the poly and the foundation, and we're still shopping with a Dec 1 insurance deadline.
- **Sewer:** scope found an offset/slipped joint 30–40 ft out with pooling, and the camera couldn't pass it, so the rest of the line is unknown.
- **Deck:** sellers did a $24K structural repair in Oct 2025 (the original posts had no footers). The invoice they provided shows $12K still listed as due, and the job excluded the railing and joists — which the inspection still flags.
- The disclosure also left the foundation, polybutylene, and radon sections blank despite all of the above. On the plus side: AC was replaced in 2024, roof in 2019, and the sellers are absentee owners who seem motivated.
Context: we have our first child on the way next summer, and we specifically went looking for something turnkey. We love the house, the size, and the neighborhood — but it feels like we'd be buying a year of projects and unknowns at a not-project price.
Questions for anyone who's been here: Did you close with seller-paid foundation work still unfinished, and how did that actually go? Anyone buy a house with whole-house polybutylene — how were the insurance hunt and the repipe in real life? And does a seller-paid repair with a "lifetime warranty" (which we haven't seen in writing) actually protect the buyer?