I want to be clear, this is not a serious discussion about the possible future expansion, but a thought exercise. Think of it something similar to people doing fantasy transit maps. I making a story with some of my friends where there were major federal capital upgrades to rail in the 1960s. A lot of the details we wrote were in places we only visited as tourists (nice train by the way, the service was nice) before so we ended up going around and asking for details.
Obviously, while 70 years of change would mean that even if a private rail operator decided to create an operation that runs on the same right of way, it would be under different circumstances and have different managers who make different decisions than real life Brightline.
But there will be some similarities. If the diesel and electric prices are the same, then the per mile cost of "fuel" is about the same. An electric locomotive will always be easier to maintain than a diesel which is essentially an electric loco with a diesel generator on board. Rail steel on steel rolling friction will mean they always beat buses per energy unit even though a bus converts chemical energy into rotation energy to move a bus while a power plant turns chemical energy into rotational to turn a generator to make electrical energy that is then sent through wires to the train for motors to turn into rotational energy. And Floridia would still be Florida even with trains. So current users of real life Brightline would be best placed to answer my questions.
Imagine there was an electrified rail right of way that went Chiefland, Tampa, Lakeland, Auburndale, Haines City, Disney Springs (skipping the rest of The Attractions), downtown Orlando, and Orlando Airport, and Cocoa. It was a triple tacked line with Class 7 tracks (125 mph limit). From Disney Springs to Orlando, the right of way was owned by Disney and an alternate right of way Amtrak uses in real life is owned by... whoever it is in real life. The right of way between Orlando and Coco had 1 Class 9 track (160 mph limit) and 1 track that had not been used since 2000. FRA inspectors concluded the tack was still usable, but downgraded the other to Class 4.
Yes I know in real life Orlando Airport and Disney are both south of downtown Orlando, so the logical way to connect both would be 417, not some roundabout way north. But just imagine the rail was already making that horseshoe, going from Disney Springs, along 417, up North along the SunRail's coridor which gets triple tracked, then east, then south back towards the Airport.
Then imagine in 2013, Brightline got the permission to operate from the FRA. They purchased a lot of land around the Orlando to Miami right of way for real estate opportunities. Stations were built and trackwork was done, land was purchased and Brightline was the proud owner of the right of way from Miami to Orlando Airport and a bunch of other real estate.
Hillsborough County, Polk County, Orange County, Levy County, Disney, and Florida came with an offer to Brightline. Have a $15 Zone. With a stop in Chiefland, 2 stops between Chiefland and Tampa, a stop at Tampa Union Station, 9 stops between Tampa and Orlando, Disney Springs, and 3 Downtown Orlando stops (including the Lynx station). Every day for 30 years, run at least 7 roundtrips on the Chiefland, Tampa, Lakeland, Auburndale, Haines City, Disney Springs (skipping the rest of The Attractions), and downtown Orlando right of way, continuing at least to Fort Lauderdale that stops at every stop. Any non-premium tickets sold within that zone are $15. Orlando Airport is not within that zone. More round trips can be made (all stop , express, or partial express... anything Brightline wants) and sold at that price. The only trips allowed in this zone not at that price are Tampa to downtown Orlando express skipping intermediate stops, which can be priced whatever. All trains that stop at Disney Springs must visit the 3 downtown Orlando stops. In exchange, Florida will pay for the land acquisition of the infill stations and a layover yard in Chiefland, the counties will pay for 70% of any construction costs of stations and, Florida will give 3-decade interest free loan for the acquisition of 23 dual-mode locomotives, plus a one-time cash infusion of $200 million after taxes. There is no stipulation Brightline has to use the Chiefland layover yard, but they do get it built for cheap and are given the land. Brightline accepted, selecting the infill stations, and allowing Tampa to Orlando to Miamai service in 2021. Electricity over the wires are sold at reasonable prices like what Amtrak sells to some Northeast corridor operators.
In this universe the Tampa Bay Rays are on the east side of the bay, so they are in Tampa instead of St. Peterburg and the rail passes by them before going north to Union Station. For 61 Home games a year, a train is perfectly scheduled to drop off people from Orlando in front of the ballpark. For the other days, people can come a bit earlier.
The Orlando to Coco track that was downgraded to Class 4 was not upgraded. the Class 9 Track was used for most operations with the other track essentially as a giant passing track or as something to use in an emergency. Heck I think in real life it is single tracked, so "one high speed track and one normal track" is better than real life's "one high speed track." If I'm wrong, well, I guess I wasn't paying attention 3 years ago when I was a tourist. I guess I was too busy having fun.
Side note, 9 stops in the distance between Tampa and Orlando would be reasonable in the northeast, but I just noticed in Florida that leaves a lot of stations in the middle of nowhere. Oh well at least with electric trains stopping isn't as annoying since stopping sends power back into the system and accelration is quick.
Would this help or hurt Brightline? On one hand, operating at $15 per rider is pretty much at such a heavy discount it would be a loss. I know this because if they could do it, they would have. Plus Brightline offers a fancy service, so their cost per rider is going to be higher than say... SunRail which does the job of moving people from A to B, but not in the best comfort.
On the other hand, even for diesel locomotive operations, rail tends to be heavy on capital costs compared to operating costs. If someone else is buying land for the stations, the wires and tracks are already there, then while this operation would be a loss, it shouldn't be a huge loss. With Orlando airport outside the contractual $15 zone, Brightline could charge normal prices for people going from the airport to east. Disney tourists who can tolerate being stopped 3 times in downtown Orlando can be sold expensive tickets. Brightline could still sell luxury tickets to people. Plus, all the real estate along the right of way should rise in value.