r/energy • u/craftythedog • 9h ago
Eco Wave Power Eyes 100 MW African Wave Energy Expansion
r/energy
•
u/mafco
•
Jan 25 '26
r/energy • u/tjock_respektlos • Feb 24 '26
r/energy • u/craftythedog • 9h ago
r/energy • u/objectivetruthsayer • 4h ago
Solar and batteries are still advancing rapidly. Tandem perovskite and sodium batteries, and even further automation and service life will continue to make these cheaper and more reliable.
So eventually we have to start talking if its more economical to be completely cut off the grid and stop paying grid connection fees and distribution costs.
I dont foresee grid costs and distribution to drop as fast as home solar costs.
Anyone know the math on this? When does it become a better idea to fully disconnect from the grid?
r/energy • u/ClutchReverie • 1d ago
r/energy • u/dchub_cloud • 8h ago
New York now has two separate "not yets" for large data centers, and they don't run on the same calendar.
The state layer is clear. In July, Gov. Hochul's Executive Order No. 62 paused DEC permits for data center projects that need 50 MW or more, for a year, while the state writes new standards.
The local layer is messier. A USA TODAY Network review published today (Nov 25, 2026) says at least 97 New York municipalities have passed temporary data center moratoriums, and eight more have banned them outright, with at least seven of those pauses passing in October. I could only read the public excerpt of that article, so if those counts are off, please correct them. One I could confirm from a local report: East Fishkill's freeze on projects over 20 MW runs to July 2029 (WAMC, June 26, 2026).
I wanted to see how that sits against the grid question, so I pulled DC Hub's Data Center Power Index (DCPI) readings as of Nov 25, 2026. "Time to power" here is a modeled estimate for new large load, from queue depth plus analyst estimates, not a measured wait:
• All 10 New York markets DC Hub tracks read CAUTION, 42.5 to 45.9 out of 100
• Modeled time to power: about 24.5 to 30 months
• New York City: 42.5, about 30 months
Those waits only answer the grid question. In New York, a site with a workable power path can still sit behind a state permit pause and a local zoning pause at the same time.
For people who site or interconnect large load in New York:
Disclosure: I work on DC Hub, which publishes the index above and tracks power, queues, projects and deals, dated, across 300+ markets. It is built to work alongside the research and tools teams already use. Happy to explain the method in comments.
DC Hub (dchub.cloud), as of Nov 25, 2026: https://dchub.cloud/connect?via=reddit&utm_source=reddit&utm_campaign=ny-moratoriums-2026-11-25
Sources: DC Hub (dchub.cloud), as of Nov 25, 2026; state pause via NY Executive Order No. 62; local moratorium counts via USA TODAY Network (Nov 25, 2026, public excerpt); East Fishkill via WAMC (June 26, 2026).
r/energy • u/Spirited-Sir-3034 • 20h ago
The first phase of the Qiongjie wind project in Shannan consists of 24 turbines rated at 6.25 MW each. The project is planned to reach 500 MW when fully built, with projected generation equivalent to the electricity needs of roughly 175,000 households.
Crews used on-site weather stations to time crane lifts around shifting winds. The turbines also use forecasts to flag ice buildup and anticipate shutdowns during high winds.
r/energy • u/cnbc_official • 17h ago
r/energy • u/Cute-Purchase-9223 • 17h ago
Saw this Guardian article this morning regarding the Ofgem situation.
Personally, I think it’s a bit of a joke. On one hand, we’ve got the National Wealth Fund investing £25 million into Invinity to support British technology and manufacturing, yet on the other, we’re potentially backing Chinese technology for our critical energy infrastructure.
We’re constantly being told to prepare for the worst amid growing geopolitical tensions, yet we’re increasing our reliance on overseas technology. It seems completely contradictory.
Now Invinity is potentially reconsidering future UK investment in favour of expanding overseas. Surely this is the complete opposite of what we’re supposed to be encouraging?
Does anyone think there’s still any hope that Ofgem might change its mind before the final decision? Interested to hear everyone’s thoughts.
r/energy • u/TheExpressUS • 1d ago
r/energy • u/huffpostuk • 21h ago
r/energy • u/Electrical_Week_5052 • 10h ago
r/energy • u/JAM_Radio • 14h ago
We published this analysis at JAM Radio. It looks at how long England’s £100 payment could last for a household spending £350 a month on a prepayment meter.
r/energy • u/Keith_McNeill65 • 18h ago
r/energy • u/Equivalent-Notice773 • 17h ago
Last week, I received a diesel support payment from the Hungarian government. It got me thinking: is fuel actually more expensive in Hungary than it used to be?
In 2012, a month’s gross median wage bought about 390 liters of petrol or 382 liters of diesel. In 2025, it bought 953 liters of petrol or 939 liters of diesel. That’s roughly 2.5 times as much fuel for a month’s pay.
The chart puts this in context by comparing fuel prices with average, median and minimum wages since 1995. I’ve marked the periods affected by price caps and shown the 2026 market-price figures alongside the consumer averages.
What tells you more about fuel affordability: the price per liter or how much of your pay it takes to fill the tank?
r/energy • u/CraftyProject4103 • 15h ago
Hello everyone!
I'm a young science enthusiast with a multidisciplinary mindset and a strong curiosity about how the world works.
I'm particularly interested in physics, chemistry, mathematics, engineering, biology and biomimetics. I enjoy connecting ideas across different scientific fields, questioning established explanations and exploring possibilities beyond conventional approaches.
My ambition is to develop into a versatile scientist, capable of combining knowledge from different disciplines to explore complex problems and contribute meaningful ideas to science and technology.
I believe that asking the right questions is just as important as finding the answers. That's why I'd like to share an idea I've been thinking about.
Here's my question:
We know that energy cannot be created or destroyed, but every energy conversion comes with limitations, particularly because of thermodynamic irreversibility.
What if, instead of optimizing individual energy-conversion devices separately, we designed an integrated system in which the energy output, heat and other by-products of one process become useful inputs for another?
Could such a coordinated system significantly reduce the overall loss of usable energy?
More importantly, what fundamental limits imposed by thermodynamics would still prevent us from achieving near-perfect energy utilization, even with advanced materials and innovative engineering?
Could combining thermodynamics, materials science and systems engineering lead to a new generation of energy systems?
I'd be interested in your perspective, particularly on the biggest scientific obstacle to making such a concept practical.
Thank you for your time!
r/energy • u/Westervangaal • 1d ago
r/energy • u/basedmarketing • 17h ago
Mechademy, maker of Turbomechanica®, an AI-native prescriptive analytics platform for critical rotating machinery, announced the completion of its $9.5 million Series A funding round led by Silverton Partners. Titanium Innovations Investments participated in the round, as did CSL Ventures, which led Mechademy's seed financing. Including this round, which closed earlier this year, total capital raised stands at more than $12.5 million. Mechademy is using the capital to support its move from oil and gas production facilities into power generation plants.
r/energy • u/Humble_Low721 • 1d ago
r/energy • u/MeTrKresearch • 23h ago
When a developer announces a 1 GW campus, I try to separate three things: the planned size of the campus, the capacity the utility has agreed to provide, and the load the operator can actually bring online by a given date. The gap matters if the connection depends on a new substation, transmission upgrades or a generator that is still on order.
The IEA’s Powering Artificial Intelligence report discusses how grid operators are trying to distinguish credible projects from speculative demand in connection queues: https://www.iea.org/reports/powering-artificial-intelligence/executive-summary
For people who have worked on these projects, what public document would you look for first? Is a signed service agreement enough, or do you wait for an energisation date and evidence that the necessary upgrades are funded?
r/energy • u/Appropriate_Ask5948 • 1d ago
Zambia gets roughly 80% of its electricity from hydro, a lot of it from Kariba. In the last big drought, flows in parts of the Zambezi basin dropped to around 20% of normal and some urban areas had load shedding of up to 20 hours a day.
Since then they've built solar fast. Ministry of Energy figures put grid-connected solar at 1,027 MW as of early October, up from 178 MW in 2024, out of 4,722 MW total installed. ZESCO also says it added 635 MW of thermal over the same stretch.
Now the Zambezi River Authority has cut Kariba's 2027 water allocation from 36 BCM to 23 BCM, split equally between Zambia and Zimbabwe, because the seasonal outlook points to El Niño and below-normal rain. They project usable storage falling to about 9% of live storage by the end of 2027.
What I can't work out is how much the solar actually covers. Daytime output should be strong, but the evening peak still sits on hydro and thermal, and the announcements I found are mostly PV, not batteries. The Copperbelt mines also need steady power around the clock.
For people who know grid planning: does 1 GW of PV without much storage meaningfully stretch a reduced hydro allocation (run less water through the turbines during the day, save it for the evening), or is the real buffer the thermal plants and imports? Has anyone seen modelling of this for Zambia or a similar hydro-heavy grid?
Sources: Zambezi River Authority statement via Zambia Monitor (15 Oct 2026), pv magazine (21 Oct 2026), Nature Africa (June 2026), Forbes Africa (Oct 2026).